Ashland School District

Johnson Controls subcontracted Building Envelope Solutions (BES) to perform 96 window replacements at the Ashland School District in Ashland Kansas.

BES was tasked with the removal and disposal of existing windows in order to install and furnish new windows and entrances. The installation included replacing aluminum storefront framing, insulated metal panels, an aluminum entrance door, brick masonry, insulated Low-E glass, and bonding.

Ensuring the school property and its contents are protected during the construction phase was a top priority. The building maintained its weather-tight integrity during the construction phase as well.

 

 Download Case Study

About BES

Building Envelope Solutions (BES) is the market leader in building envelope related energy efficiency upgrades. Through its turnkey deliverable, BES also partners with Energy Services Companies (ESCO’s) to assist them in saving energy for their customers.

BES Links

Address

2750 Vinland St.
      Oshkosh WI 54901

(920) 267 6110

(920) 273 6005

info@energy-bes.com