Situation
BES partnered with our ESCO client to audit the school buildings of the Mukilteo School District, then contracted to implement the building envelop measures across the district.
Scope of Project and Product Application
BES was tasked with identifying all the air gaps in roofs, doors, windows, and walls for classrooms, libraries, auditorium, gyms and pools throughout the district.
The installation consisted of weather stripping, door sweeps, air sealing, caulking, and applying foam one or two-part foam depending on the type of joint, and it's visibility to the public eye.
The highest quality materials were used and the project was warrantied. The entire project was completed in eight weeks, including all mobilization, installation, and clean up.